Reduce the impact of your flight with carbon offsets

Click this Banner for Current Road Conditions

Airport Update

60°F / 16°C

SW 8 mph

Request for Qualifications for Engineering Services

The Jackson Hole Airport Board (the “Board”) is soliciting qualifications and experience information for its use in selecting a principal consultant to provide certain engineering and associated planning services at the Jackson Hole Airport, Jackson, Wyoming (the “Airport”). The engineering services contract will be for a five (5) year term, beginning on December 19, 2018. […]

Read More

Request for Bid – Two 4×4 One Ton Pick-Up Trucks

The Jackson Hole Airport will be accepting sealed bids for the following equipment in a current model; TWO 4X4 ONE TON PICK-UP TRUCKS. Each bidder must furnish cash or surety bond per Wyoming Statutes, in the amount equal to (5) five percent of the bid as part of their completed bid package. Successful bidder’s bond […]

Read More

Request For Proposals for Concessions Opportunity at the Jackson Hole Airport

The Jackson Hole Airport Board is seeking firms to provide proposals for the operation of a concessions opportunity at the Jackson Hole Airport. The concession opportunity includes a restaurant/bar and retail goods concession in the secure portion of the passenger terminal building at the Jackson Hole Airport, and a snack shop in the non-secure portion […]

Read More

Request For Qualifications for the Aircraft Rescue Fire Fighting & Snow Removal Equipment Facility Design

The Jackson Hole Airport Board is seeking a firm to provide design services and prepare an environmental assessment for a joint use ARFF/SRE facility at the Jackson Hole Airport. The joint use facility will include the Airports aircraft rescue & firefighting facility and snow removal equipment, along with facilities for the Teton Interagency Helibase Proposal […]

Read More

Disadvantaged Business Enterprise (DBE) Goal Setting

The Jackson Hole Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 1.6% for FAA-funded contracts/agreements. The proposed goal pertains to federal fiscal years 2019 through 2021. The proposed goals and rationale is available for inspection between 9:00 a.m. and 5:00 p.m., Monday through Friday at the Jackson Hole Airport 1250 E. […]

Read More

Open Burn – 6/7/2018

The Jackson Hole Airport will be conducting a WYDEQ permitted open burn of wood products on Thursday, June 7th starting at 6 am. This burn will be supervised. If you have any questions or concerns, please call Airport Operations at (307) 413-1519.

Read More

Road Construction – Summer/Fall 2018

In addition to construction projects underway on the Airport property, there are several local roadways being affected by construction that will impact traffic coming to and from the Jackson Hole Airport. Grand Teton National Park is currently constructing a roundabout at the Gros Ventre Junction which is located just over two miles south of the […]

Read More

Check your Flight Status

Use the toggle below to switch between Arrival and Departure Status

Reduce the impact of your flight with carbon offsets.

Summer Schedule

Current Conditions

Reduce the impact of your flight with carbon offsets.

60°F / 16°C

High 67°F / 19°C
Low 40°F / 4°C

Cloud Coverage: 0%
Visibility: 6.2 miles
Wind: 8 mph SW

  • Thursday

    69°F / 21°C

    NW 10 mph
  • Friday

    75°F / 24°C

    NW 9 mph
  • Saturday

    79°F / 26°C

    WNW 14 mph
Full Forecast